I moved a calendar item by editing it. When I go to the calendar, the change is correct. However, in the small calendar shown as a portal island, the hyperlink on the original date is still there. I checked the settings and "always build" is still checked.
The example I have is located at:
http://www.scbmwrc.com/forum/ubbthreads.phpThe original date is July 27. The new date is August 16.
How do I fix this?
Thanks,