600W 12V Wind Solar Hybrid Charge Controller regulator
when you buy it, pls informus your wind turbine is AC output or DC output ? it is important to ship thecorrect product.
Product details:
1.2 Futures
1.2.1 Automatic dump load while the wind turbine generatoroverload.
1.2.2 Batteries overcharge or overdischarge protection.
1.2.3Protect batteries charge to solar panel. at night
1.2.4Protect electric shock.
2、Technical specifications :
SGC-W1206
Rated voltage(V)
12V
Load Rated power(W)
100W
Solar Panel
12V-150W
Rated current of wind-generator(A)
35A
Battery over discharge protection voltage
11V
Battery over discharge recovery voltage
11.5V
Final charge voltage(V)
14.4V
Floating voltage(V)
13.9V
Recover time of braking
30min
Allowable ambient temperature (℃)
-10~40
Dimension(mm)
208x140x74
Weight(g)
1500g
3. Installing steps
3.1 Panels:
3.1.1 Terminals in accordance with the upper part of the label, the right equipment connected to cable:
S+:Means nothing S-:Means nothing B+:Batteries + B-:Batteries -
DC+:Means nothing -1 :Means nothin-2 :Means nothing
3.2 Installing steps
3.2.1Controller based on its protection level, housed in indoor and outdoor drying, ventilation, the controller may not be around the inflammable and explosive materials
3.2.2 Controller should be mounted vertically, hanging solid.
3,2,3 Unloading an external device, due to unloading, the equipment surface temperature will exceed 85 ℃, must be firmly placed on the location where not to be touched easily, meanwhile to maintain a well-ventilated, non-flammable, explosive goods.
3.2.4 Before wiring, to put the first wind turbine brakes manually switch to the \"︱\"position, when wiring to prevent electric shock accidents caused by running generators.
3.2.5 Check the wiring correct, to put the wind turbine brakes manually switch to the \"O\" position, equipment into operation
Security Warning: the boot before the battery must first access controller may not be the case without the battery running generator, or generating units and the controller will cause damage!
3.3 Running state, indicator function setting
3.3.1 Running indicators
Controller in operation mode, the indicator will show the different status of the operation of equipment, detailed in the table below:
Internal dump load
State
Explanation
Lights
Full battery capacity
L1、L2 (Green)
Lights
Normal battery capacity
L1 (Green)
Lights
Low battery capacity
L1 (Green)
Blinks
Battery exhausted
(Green)
Lights
Wind turbine generator is working
≈ (Red)
Lights
Dump load
(Green)
Lights
Means nothing
(Green)
Lights
Means nothing
4.0 Notes
4.1 Ordering Information
4.1.1 Order should be detailed description of equipment configuration requirements, such as: generator sets parameters, the choice of external dump loading devices, protective grading, as well as overload protection.
4.1.2 Use under special conditions, can be customized in accordance with the usage conditions of users.
4.2 Installation Notes
4.2.1 Before accessing controller to confirm the system equipment, such as, wind turbine, batteries, lightning protection devices, cable selection configuration is correct, accurate installation.
4.2.2 Check-to-ground insulation resistance of equipment should be in line with the wind / light generating system of technical requirements.
4.2.3 Installation, disassembly, repair equipment, wind turbine will be sure to manually switch the brake to the \"|\" position.
5.0 After-sales service
5.1 Customers in the procurement, use, or for advice on the quality of this product can contact the designated distributors or with the company.
Quality warranty:
1. CECertificate
2.12 month warranty
3. the buyer is responsible for the return post mail cost
4.15 days refund and20 days exchange after receiving the product
Payment:
1. We prefer you can pay via paypal,thank you !
2. pls pay within 5 days after winning the sale or buying.
Shippment:
1.We ship to worldwide,We only ship to the paypal adress, pls confirm it when you are buying.
2. Taxes and charges are not included in the item price or shipping charges.These charges are the buyer’s r esponsiblity
please check with your country’s customs office to determine what these additional costs will be prior to offerding ying.
Contact us:
you can contact us, we will reply you within 24 hours Engineered for professional sellers!