Originally restored in 2003,
additionally restored in 2015 by
Agri-Crafts LLC Date: 3/31/2015
4173 Bucklick Creek Rd
New Haven, MO 63068 Invoice # 237
Including:
3/2/15
4.3
Labor: Install lower water pipe and hose, push rods and rocker arm assembly. Adjust values. Connect rocker arm, oil pipe. Install rock shaft housing and power-trol oil pipes. Fill transmission with oil. Install generator and battery box and platform.
236.50
3/9/15
Materials: 2.5 gallons 10W
15.28T
3/11/15
0.4
Labor: Install 4 quarts hydraulic oil (need to check level after running tractor). Fill PTO clutch housing with oil. Repair wire for tail light with new connector assembly.
22.00
3/5/15
Subcontractor: Ceramic coat manifold
170.00
3/11/15
Materials: Bolts and flat washers
10.92T
3/11/15
Materials: HD30
24.49T
3/11/15
3.0
Labor: Install manifold, carburetor, fuel line and breather pipe, and exhaust pipe. Connect throttle and choke linkage. Fill cooling system with water. Install and connect battery and polarize generator. Disconnect coil wires and re-connect with correct polarity. Hook up battery charger and start engine. Operate power-trol and check oil level, add 1 quart oil. Drive tractor in all gears and get up to operating temperature. Re-torque rear wheel clamps. Remove valve cover and rocker arms and adjust valves hot. Install valve cover
Amount
2/6/15
Parts: Sediment Bowl Repair Kit
20.35T
2/6/15
Shipping and Handling: On above item(s)
10.99
2/11/15
6.7
Labor: Remove lower water pipe and cylinder head. Remove 4 cylinder head studs that were incorrectly installed and install correctly. Clean cylinder block gasket surface and studs. Clean cylinder head nuts and chase threads in nuts and on studs. Remove power shaft pump housing and clean. Pull outer rear axle bearing cups, drive inner cups and oil seals out of axle housing and install bull gear. Left axle needs work on inner seal area.
368.50
2/11/15
Parts: 1-O-Ring; 2-Seals; 4-Bearing Cones; 1-Seal; 4-Bearing Cups; 1-Gasket
719.90T
2/11/15
Parts: Carb Gasket Kit; Manifold Gasket Set; Valve Cover Gasket; Rear Axle Felt Seal; Rear Axle Felt Retainer
159.64T
2/11/15
Shipping and Handling: on above item(s)
29.39
2/17/15
1.0
Labor : Fibre wheel rust from seal area of left axle. Mix and apply epoxy, sand smooth to fill void for sleeve.
55.00
2/18/15
Parts: 2-shims
45.18T
2/19/15
Subcontractor: Extract broken belt from manifold, set up and mill manifold. Extract two broken bolts from cylinder head and install heli-coils. Set up and mill head.
325.00
2/19/15
Parts: Head gasket; Oil sleeve
71.03T
2/19/15
Shipping and Handling : On above item(s)
10.00
2/19/15
Parts: Hardware
12.83T
2/24/15
Shipping and Packaging to Ceramic Coating
30.25
2/25/15
5.7
Labor: Install oil seals in power shaft pump housing and install and wire bolts. Install sleeve on left axle, grease outer bearing and install axle and bull gear. Free up rear wheel adjusting bolts, install wheels in original positions and snug clamps. Tighten and lock rear axle nuts. Clean , assemble and install auto fuel shut-off in fuel tank. Connect oil lines. Clean, install and torque cylinder head.
313.50
2/25/15
Parts: Lead Washers for Head Studs
41.42T
2/25/15
Materials: 6 Gallons Gear Oil
89.27T
2/25/15
Shipping and Handling: On Above Item(s)
9.10
2/26/15
Parts: 2-Washers; 4-O-Rings
20.05T
2/28/15
Parts: Gasket
8.48T
Sales Tax
76.93
Total
$2,416.81